Major Works Overview

Construction of Bridge Over River Indus for Diamer Bhasha Dam Project

It is basically an access bridge over river Indus for Diamer Bhasha Dam. Then length of bridge is 312 meter. It is a balanced cantilever box girder bridge with central span of 156 meter and two side spans of 78 meter each. It is a challenging job because for side of bridge is inaccessible and then other challenge is its left pier. The pile cap of this pier is underwater. The soffit of pile cap is at the level of 941.35 whereas water level in month of April is 953 which will start raising in May and reach at 968+00 or even more in case of flood.

Cost of Project                                Rs 1304 Million

Client                                              Frontier Works Organization

Length of Bridge                            312 Meter

Start Date                                       Feb 21

Completion Date                           May 24

Type of Work                                 Cantilever Box Girder Bridge

  • ESTABLISHMENT OF 200 BEDS GENERAL HOSPITAL (I/C) MCH & EYE HOSPITAL RAWALAKOT DISTRICT POONCH AJ&K PHASE-II.

This is an extension of the existing Hospital Facilities which comprises remaining work of 200 Beds MCH & Eye Hospital, main building, external development, Doctor Apartments, Paramedical Staff Hostel, Nursing Hostel, Doctor Hostel and External Water Supply arrangement. The project is situated in the city of Rawalakot AJK.

Cost of Project                                Rs 696 Million

Client                                              PWD Building/PHE (North) Muzaffarabad

Start Date                                       Jan 21

Completion Date                           Dec 24

Type of Work                                 Building Works

No. of Buildings                             08

Total Covered Area                      150000 Sft

  • CONSTRUCTION OF MAKRI INTAKE WEIR AND INSTALLATION OF FLOW METERING SYSTEM.

Due to Neelum Jhelum Hydropower Project water in Neelum River is reduced after Nosehri due to which a shortage in water supply to Muzaffarabad is expected during low water season. This project is mainly construction of Weir on river Jhelum at Makri to raise water level at this point and to make intake structure to keep the water supply intact;

Cost of Project                                Rs 862.773 Million

Client                                              PHE Division, Muzaffarabad

Start Date                                         June 2020

Completion Date                           May 2022

  • UPGRADATION AND RECONDITIONING OF SHARDA – KEL ROAD

This road is between Sharda and Kel (18.1Km) in a Neelum Valley, AJK. This is an important road strategically as well for tourism. It is basically a hill road with river on one side and hills on other side. It is a remote area which make construction as well road is to keep operational during construction;

Cost of Project                                Rs 553.379 Million

Client                                               PWD Highway Division, Neelum

Start Date                                       June 2020

Completion Date                           May 2023

CONSTRUCTION OF MIR WAIZ MUHAMMAD FAROOQ SHAHEED MEDICAL COLLEGE, AJK

This building project comprised of 11 buildings with a total covered area of 260000 sft. Being a part of Abbasi Institute of Medical Sciences (AIMS) this building will serve as Medical College;

Cost of Project                                Rs 1903.558 Million

Client                                              PWD, AJK

Start Date                                       December 2016

Completion Date                           June 2024

No. of Buildings                              11

Covered Area                                260000 Sft

 MAJOR PROJECTS COMPLETED

  • REHABILITATION OF BRIDGES

Along with construction of bridges the company has capacity and capability of rehabilitation of bridges as well. Following rehabilitation has been executed under the profile of Engr. M. Fayyaz Zaeem and Engr. Mansoor Iqbal.

Rehabilitation works consist of Micropiling, anchoring  for creating bond between eccentric well caps and brick masonry, Repair of eroded and displaced brick masonry,     External pre-stressing  to enhance the overall integrity of the structure, Replacement of bearing pads to reduce the impact on structure,     Repair of cracks by using epoxy grouts,  Repair of expansion joints to improve the riding quality,    Re-grouting of existing cables, Application of waterproofing compound, Improvement of Asphaltic wearing surface and drainage facilities.

  • Rehabilitation of Bridge over River Indus Ghazi Ghat.
  • Rehabilitation of Bridge over River Sutlej, Bahawalpur
  • Rehabilitation of Kunhar Bridge, Balakot AJK.
  • Rehabilitation of Ayub Bridge, Havelian.
  • Rehabilitation of Dina Bridge, Main G.T Road
  • Rehabilitation of Misakaswal Bridge.
  • Rehabilitation of Head Punjnad Bridge.
  • Rehabilitation of Kharrapa Bridge Over Indus Highway
  • Rehabilitation of Ayub Bridge Havelian at Km 56+050 KKH, (N-35)

BOX GIRDER BRIDGES

  • CONSTRUCTION OF RCC BRIDGE KOTLI TATTAPANI ROAD

This is a balance cantilever box girder bridge on river Poonch at Tattapani Road, Kotli. Balanced cantilever construction is a phased construction of a bridge superstructure. The construction starts from the piers cantilevering out to both sides in such a way that each phase is tied to the previous ones by post-tensioning tendons, incorporated into the permanent structure, so that each phase serves as a construction base for the following one. The bridge was of strategic nature as it connected Kotli with the border area, Tatta Pani. Keeping in view the environmental protection of the aqua culture, the design of the bridge was specially designed as the location of the bridge is situated in the National Park and also consists critical habitat.

Our company is first Pakistani Company who has already completed two cantilever box girder bridges on rivers and has completed its 3rd bridge of the same type.

Cost of Project                                Rs 449.68 Millions

Client                                                 Communication & Works Deptt, AJK

Financed By                                    Asian Development Bank

Start Date                                         January 2018

Completion Date                           April 2019

Length of Bridge                            160.42 Meter

Central Span                                   136.15 Meter

Right Span                                       15.125 meter

Left Span                                          9.15 Meter

Width of Bridge                               10.70 Meter

Width of Carriage way                8.50 Meter

Width of Foot Path                        1.20 Meter

Type of Bridge                                 Balance Cantilever Box girder

  • CONSTRUCTION OF LANGARPURA BRIDGE OVER RIVER JHELUM, AJK

Balanced cantilever segmental construction for concrete box-girder bridges has long been recognized as one of the most efficient methods of building bridges without the need for falsework. This method has great advantages over other forms of construction in urban areas where temporary shoring would disrupt traffic and services below, in deep gorges, and over waterways where falsework would not only be expensive but also a hazard. Construction commences from the permanent piers and proceeds in a “balanced” manner to midspan. A final closure joint connects cantilevers from adjacent piers. The structure is hence self-supporting at all stages. Nominal outof-balance forces due to loads on the cantilever can be resisted by several methods where any temporary equipment is reusable from pier to pier.

Bridge over River Jhelum at Langarpura, Muzaffarabad AJK is an example of unbalanced cantilever box girder bridge, which is designed to provide access to Langarpura Town Ship Scheme primarily for earthquake affecties of 2005. The bridge was successfully completed in September 2016.

Cost of Project                                Rs 419 Million

Client                                                 Earthquake Reconstruction  & Rehabilitation Authority           

Main Contractor                            M/s China Xinjiang Beixin Construction Group

Start Date                                         May 2013

Completion Date                           November 2016

Length of the Bridge                     122 Meter

Width of Carriage way                8.5  Meter

Width of Pedestrian Passage     1.2 Meter

Type of Construction                     Pre-stressed Box Girder Segmental Construction using Traveler Form Work

  • CONSTRUCTION BRIDGE OVER RIVER NEELUM AT JALALABAD, MUZAFFARABAD

The company is one among few in Pakistan who have constructed balanced cantilever box girder bridges on rivers. This is the first Box Girder Balanced Cantilever Bridge executed by us. The construction of the box over the piers is performed by overhead traveler gantry. The box segments are cast in place with hollow shape of box. This bridge is located in the center of city and was completed in September 2014, with salient features as below;

Cost of Project                                Rs 365 Million

Client                                                 Earthquake Reconstruction  & Rehabilitation Authority           

Main Contractor                            M/s China Xinjiang Beixin Construction Group

Start Date                                         November 2012

Completion Date                           September 2014

Length of Bridge                            123.970 Meter

Central Span                                   67.50 Meter

End Spans                                        30 meter & 26.415 meter

Width of Bridge                               10.70 Meter

Width of Carriage way                7.30 Meter

Width of Foot Path                        1.20 Meter

Type of Bridge                                 Balance Cantilever Box girder

Method of Construction:             Pre-stressed segmental construction using overhead gantries       

Type of Foundation                       Shallow Foundation

  • CONSTRUCTION OF 14.4 MW JHING HYDROPOWER PROJECT

Jhing is situated approx. 30 km from Muzaffaraabd City at Neelum Road. Hydropower projects use a well-established method of generating electricity that uses moving water (kinetic energy) to produce electricity.  This production unit has been linked with National Grid. The project consists of construction of Forebay and wasteway, Penstock supports and Anchor Blocks, Powerhouse, Tail Race, Staff Quarters and Access Road.

Cost of Project                                Rs 521.8 Million

Client                                                 Power Development Organization, AJK

Start Date                                         June 2016

Completion Date                           May 2021

Type of Work                                   Mechanical and Civil

  • RECONSTRUCTION OF AZAD PATTAN RAWALAKOT ROAD

This is a major artery of AJK, which links Azad Pattan and Rawalakot. Length of road under this project is 33 Km, being constructed under Flood Emergency Reconstruction & Resilience Project (FERRP) funded by Asian Development Bank (ADB);

Cost of Project                                Rs 1569.89 Million

Client                                                 PIU, FERRP C&W, AJK

Start Date                                         January 2017

Completion Date                           March 2019

Length of Road                              33 Km

Type of Road                                  Asphaltic Road

  • RECONSTRUCTION OF RAWALAKOT HAJIRA ROAD

This is a major defence road of LOC in AJK having length of 20 Km, being constructed under Flood Emergency Reconstruction & Resilience Project (FERRP) funded by Asian Development Bank (ADB);

Cost of Project                                Rs 647.582 Million

Client                                                 PIU, FERRP C&W, AJK

Start Date                                         May 2017

Completion Date                           October 2018

Length of Road                              20 Km

Type of Road                                  Asphaltic Road

  • CONSTRUCTION OF PRIME MINISTER HOUSE MUZAFFARABAD AJK

Prime Minister House was a building complex comprising of different buildings both residential and offices for the Prime Minister of AJK. The project was completed in 2017. The salient features of the project are as under;

Cost of Project                                Rs 457 Million

Client                                                 China International Water & Electric Corp (CWE)

Start Date                                         June 2013

Completion Date                           April 2016

No. of Buildings                               11 Nos

Area of the Project                        190,400 sft

Type of Construction                    RCC Framed Structure

  • CONSTRUCTION OF WORKING WOMEN HOSTEL, AT SALCC H-8 ISLAMABAD

The building is being constructed to facilitate accommodation working women. Building consist of G+2 floors, with total covered area around 23000 Sft;

Cost of Project                                Rs 47.130 Million

Client                                                 Sindh Graduate Association (SGA)

Start Date                                         January 2018

Completion Date                           June 2019

No. of Floors                                    G+2

Covered Area                                23000 sft

  • CONSTRUCTION OF WATER TREATMENT PLANT AT MAKRI MUZAFFARABAD AJK

Water Treatment plant at Makri Muzaffarabad was a part of water supply enhancement project to the city of Muzaffarabad. It consisted the construction of Filter beds, Machine Hall, Clarifiers, connecting channels etc. The said project was completed in 2017. The salient features of the project are as under;

Cost of Project                                Rs 226 Million

Client                                              China International Water & Electric Corp (CWE)

Start Date                                         April 2014

Completion Date                           April 2016

No. of Clarifiers                               02 Nos

Filter & Machine Hall Building     01 No

Connecting Channel                   01 No

Pre Settling Tank & Flash Mixer   01 No Each

  • CONSTRUCTION OF ACCESS BRIDGE OVER RIVER JHELUM FOR PATRIND HYDROPOWER PROJECT, AJK

Company has the honour to construct first multi-span continuous ‘I’ shape girder bridge in Pakistan on River Jhelum. Each ‘I’ shape girder is 175.35 m long and is stressed partially before and partially after launching.

Cost of Project                                Rs 258 Million

Client                                                 Sambu Pakistan (Pvt) Ltd

Start Date                                         October 2010

Completion Date                           July 2012

Length of Bridge                            175.35 Meters

Central Span                                   65 Meters

End Spans                                        50 meters

Width of Bridge                               10.70 Meters

Width of Carriage way                7.30 Meters

Width of Foot Path                        1.20 Meters

Type of Bridge                                 Multi-span continuous ‘I’ shape girder

  • CONSTRUCTION OF THOTA BRIDGE OVER RIVER JHELUM, AJK

This bridge is 2nd in Pakistan of its type multi-span continuous ‘I’ shape Girder Bridge completed in November 2016, with salient features as below;

Cost of Project                                Rs 309 Million

Client                                                 M/s China Xinjiang Beixin Construction Group

Start Date                                         January 2014

Completion Date                           November 2016

Length of the Bridge                     110.78 Meter

Central Span                                   58 Meter

Side Spans                                       2 x 26.39 Meter

Width of Carriage way                8.5 Meter

Width of Pedestrian Passage     1.2 Meter

Type of Construction                    Pre-stressed Pre cast multi-span ‘I’ shape girder bridge

  • CONSTRUCTION OF PESHAWAR MORE INTERCHANGE-MBS-PACKAGE-II ISLAMABAD

The company has the honor to participate in the prestigious project of Rawalpindi Islamabad Metro Bus Project and working on the biggest of all eight sections i.e. Islamabad Package-II. The company has undertaken the following portions of Metro Bus corridor;

  • Metro Bus Corridor including Bus Station
  • Six small bridges
  • Half a kilometer long huge 3 cells box culvert,
  • More than a kilometer long 72” Ø RCC pipe line in two rows
  • 1 Km long Pedestrian Underpasses
  • Interchange comprised of eight flyovers having multi-span continuous pre-stressed box girders having total length of 4.1 Km.

Cost of Project                          Rs 4,120 Million

Client                                           National Logistics Cell / RDA

Start Date                                   May 2014

Completion Date                     March 2016

  • CONSTRUCTION OF VEHICULAR UNDERPASS, NEAR DISTT COURT RAWALPINDI

The company has specialized in construction of pre-cast underpasses on fast track basis and has successfully completed around a dozen underpasses on various locations on N-5 having sizes from 3m x 3m upto 10m x 5.1m (internal size). Company has another distinction of using tunnel formwork in construction of Box Culverts and has successfully completed a 88m long 3 cell box culvert of 2 x 9.3m x 5.2m (for vehicular traffic) + 1 x 5.5m x 5.2m (for railway train) at junction of Adyala road and N-5 near district courts, Rawalpindi.

Cost of Project                                Rs 182.98 Million

Client                                                 National Logistics Cell

Start Date                                         December 2008

Completion Date                           March 2011

  • SMALL HYDROPOWER PROJECTS
  • Lining of diversion Tunnel No. 1 & 2 at 102MW Gulpur Hydro Power Project
  • Sharda Hydropower Project (Restoration of Flood Resilience Protection of Structure)
  • Penstock Pipe for 1.79MW Dhanna HPP, District Kotli 2 x 800 KW Hajira Hydropower Project
  • Penstock Pipe for 2×1000 KW Kapa Banamula HPP, District Hattian Bala.
  • Construction of intake Sluiceway at 4.8MW Battar Hydropower Project Distt Havelian.
  • Providing, Laying, Welding and concreting of Wasteway Pipe at 4.8MW Battar Hydropower Project Distt Havelian. 
  • Remaining Penstock and Spillway Works of 2x500KW Bhedi Doba Hydropower Project, Distt Haveli AJK
  •  Secant Pile Wall around Power House at Patrind Hydropower Project, Muzaffarabad, AJK.